8-ID
  8-ID Beamline logbook mirror  Not logged in ELOG logo
Message ID: 494     Entry time: Fri Jan 27 15:59:20 2017
Author: Joe Strzalka 
Type: 8-ID-"G" 
Category: User Manual 
Subject: 8-ID-G User Manual 
This entry serves as a stub for a User Manual for GIXS Users at Beamline 8-ID-G. The idea is to provide a place for links to other Elog entries for specific topics.Offsite users should follow the mirror links. The regular entries are not accessible offsite.

.A. Upstream Optics
.......1. White Beam Slits in A-Station
.......2. D-Station Monochromator entry 665/mirror 665
.B. E-Hutch (Hardware)
.......1. Upstream components
............a. XIA Filters entry 465/mirror 465
............b. Fast shutter entry 756/ mirror 756
............c. Be CRL for vertical focus entry 556/mirror 556
.......2. Diffractometer
............a. Calibration information: entry 397/ mirror 397
.......3. Sample Environments
............a. Multi-sample Vacuum Environment for static measurements with automated sample changer entry 696/mirror 696
............b. Solvent Vapor Annealing entry 669/mirror 669
............c. Relative Humidity entry 669/mirror 669
..................i. Humidity sensor HC-610 from Ohmic Instruments: attachments 3-5 of entry 411/mirror 411.
............d. Filmetrics F20-UV for in situ thickness monitoring via spectral reflectance: Filmetrics support page
............e. Thermal Annealing
..................i. Linkam HFSX350-GI Stage:
........................(1) Part 1 entry 540/mirror 540
........................(2) Part 2 entry 560/mirror 560
........................(3) Part 3 entry 561/mirror 561
........................(4) Part 4 entry 578/mirror 578 expansion board for serial communications
.................ii. Lakeshore 340 Unit manual: entry 288/ mirror 288
................iii. High temperature (700 C) oven
........................(1) Setup and operations: entry 351/mirror 351
.................iv. Thermal grease: entry 673/mirror 673
............f. In situ charge transport measurements entry 696/mirror 696 (see attachments)
...................i. Keithley 2400 Source-Meter SMU Instrument -- vendor site with links to manual and spec sheet
..................ii. Keithley 2400 at the beamline and EPICS support entry 528/ mirror 528
.................iii. Keithley 2400 for sweep scans with modified IOC to support waveform output entry 609/ mirror 609
..................iv. Keithley 2450 sourcemeter for 9-ID-D: entry 873 / mirror 873
............g. Inert atmosphere
...................i. Oxygen sensor
............h. Tensile stage entry 579/ mirror 579
............i. Agilent 33522A function generator support entry 648/ mirror 648
............j. Mini breadboard plates entry 650/ mirror 650
............k. Optical components: alignment laser entry 651/ mirror 651
............l. Spin coater
.......4. Downstream components
............a. Detector table: 3-D model accessible in Creo with the name “4308-460000.asm”
............b. Secondary detector system entry 702/ mirror 702
.......5. Detector
..............a. Pilatus 1M
..............b.
.C. E-Station (Software and Controls)
......-1. Beamline computer: pepper entry 762/ mirror 762
.......0. Remote user access via NX client entry 731/ mirror 731
.......1. EPICS, caQtDM/MEDM and Spec:
..............a. Starting up EPICS and Spec and Pilatus interfaces
....................i. caQtDM (2018-1-present)entry 566/mirror 566
...................ii. medm (up to 2017-3) entry 495/mirror 495
..............b. Useful description of Spec and EPICS from 7-ID https://www1.aps.anl.gov/Sector-7/7-ID/Beamline-Controls-and-Data-Handling
..............c. Writing macros in Spec at 8-ID-E entry 685/entry 685
.......2. Matlab entry 496/mirror 496
.......3. GIXSGUI
............a. download: https://www.aps.anl.gov/Sector-8/8-ID/Operations-and-Schedules/Useful-Links/Sector-8-GIXSGUI
............b. GIXSGUI helpfile: https://www.aps.anl.gov/files/download/SECTOR8/8-ID/doc.pdf
............c. Manual for fitting curves in GIXSGUI: linefit_manual.pdf
............d. Help getting started with GIXSGUI and FAQ list: entry 612/mirror 612
.......4. Pepper screen configuration: entry 575/mirror 575
.D. Chemistry Lab: entry 829/mirror 829
.E. Mechanical Lab
.F. Polymer Lab (spin coater): entry 226/mirror 226
.G. Remote Data Access
......1. PVwebmonitor: entry 553/mirror 553
......2. Live Specplots: entry 554/mirror 554
.H. Documents
......1. Sector Orientation entry 536/mirror 536
......2. Tip sheets
.............a. Vacuum GISAXS and GIWAXS with the multi-sample chamber entry 497/mirror 497
......3. ESAF materials
.............a. Experimental Safety Overview
.............b. General ESAF instructions entry 589/mirror 589
.............c. Standard Operating Procedures
....................1. Carcinogens: entry 555/mirror 555
....................2. Linkam stage/Cryogens: entry 639/mirror 639
....................3. Use of the spin coater in the Polymer Lab: entry 226/mirror 226
....................4. Venting the GIXS Beamline Safely: entry 754/ entry 754
......4. Bringing samples and other materials to Argonne
.............a. Transporting hazardous materials to the APS
.............b. DOT small quantities exceptions
......5. Chemical Waste Instructions, Log Sheet and Example: entry 672/mirror 672
......6. docs8ide -- GitHub-based documentation for 8-ID-E: entry 767/ mirror 767
.I. User FAQs
......1. Is our proposal still active? How many shifts are left? entry 580/mirror 580
......2. How can I get on site? It's my first visit/I'm arriving late or on the weekend/ I don't have a User badge. entry 602/mirror 602
ELOG V3.1.4-395e101