Message ID: 811     Entry time: Mon Oct 4 10:01:07 2021
Author: Eric Dufresne 
Type: 8-ID-I 
Category: Important Log Books 
Subject: Logbook notes for 2021-3 for 8-ID-I operation 
https://logbook.xray.aps.anl.gov/8id/8-ID/596 Important distances 2018-3
https://logbook.xray.aps.anl.gov/8id/8-ID/674 Lens positions for 1 and 2D focusing
https://logbook.xray.aps.anl.gov/8id/8-ID/701 2020-1 notes
https://logbook.xray.aps.anl.gov/8id/8-ID/721 2020-2 notes
https://logbook.xray.aps.anl.gov/8id/8-ID/744 2020-3 notes
https://logbook.xray.aps.anl.gov/8id/8-ID/761 2021-1 notes
https://logbook.xray.aps.anl.gov/8id/8-ID/761 2021-2 notes

https://anl.app.box.com/folder/130409499261?s=3t71weuketeea2s3xnvoo59tcclxk3dw Handwritten notes

8-ID-I ESAF 2021-3 https://beam.aps.anl.gov/pls/apsweb/esaf0001.start_page?i_attrib=247172

10/4/2021 Alignment 10.945 keV

8ID-E mono was at 10.945 keV.
https://anl.app.box.com/file/868578355997 Notes
[9:22 AM] Dufresne, Eric
Flux is the same as on 9/21, so mirror and diamx are in good shape. What we found last fiscal year is that when
the operation mode doesn't change, the source point returns roughly to the same position from week to week.
Flux is 1.3x10^12 ph/s with 250x250 si1 slit, mono at 10.945 keV as last alignment on 9/21/21.
<https://teams.microsoft.com/l/message/19:[email protected]/1633357336064?tenantId=0cfca185-25f7-49e3-8ae7-704d5326e285&amp;groupId=4c5a5c95-cec4-4898-b2db-37615c5a8ceb&amp;parentMessageId=1633355943169&amp;teamName=DYS_General&amp;channelName=8-ID-I Ops&amp;createdTime=1633357336064>

10/12/2021 Alignment unchanged in 8-ID-I
https://anl.box.com/s/68gb05v652pquhhom7sagzju4xz1jm70 Notes.
[8:54 AM--Teams 8ID-I OPs] Dufresne, Eric
Flux in 8-ID-I pind1 is same as last week, so I'm not touching the mirror.
Flux on pind1 is 7.48x10^11 ph/s in 250 um x 150 um (HxV).
Flux on pind2 is also good. Flux is 3.61x10^10 ph/s, very very close to
last week. I am getting ready now.

https://logbook.xray.aps.anl.gov/8id/8-ID/813 Set up with QZ and SN IC2.
Above describes electronics.
https://anl.box.com/s/gh8zzej4j3a194ys8q43yiotsz9dwu2v Lab notes 10/12/21

10/13/2021

Water leak inside ring
See pictures https://anl.box.com/s/3wec9gzrkx4t0gv9nrv3qdil6tig020y
with PDF file of repair status.
Beam was off after 2h am on 10/13.

10/19/2021
https://anl.box.com/s/mr5f9fza0fpeg2bofrrtnovk6aus8gyq Notes

Flux on pind1 was 2% below that of 10/13/21.
Flux on pind2 was right on.
Flux on pind4 was 2.2x10^10 ph/s

11/02/2021
ALignment at 7.35 keV
8ID-I Wei Chen focus at sample
8ID-E Shpyrko
https://anl.app.box.com/file/880492191996 My 8ID-I notes

11/9/2021
https://anl.app.box.com/file/882923569293 My 8ID-I notes
Alignment at 10.945 keV.
N=15 Be lenses R=0.2mm 1D

[9:11 AM] Dufresne, Eric
Zhang, Qingteng Strzalka, Joe Narayanan, Suresh Started aligning 8ID
[9:38 AM] Dufresne, Eric
Flux with 250umx250um si1 is 1.08x10^12 ph/s in 8-ID-I. We can align 8ID-E Joe.
&#8203;[9:41 AM] Dufresne, Eric
This is lower than on 10/4/21, 1.31/1.08= 1.21 so 21%. I am not hunting this down Narayanan, Suresh.
&#8203;[10:31 AM] Dufresne, Eric
A lot less signal on pind2 FYI, only 1.44x10^10 ph/s (flux pind2 32493-1355), i..e 40% of 10/12/21.
Didn't see anything obvious. We are only 87% of pind1 from 10/12.
TeamsChatHyperlink

11/15/2021

We determined that the lost flux last week was because we didn't pump the 8-ID-I beamline.

11/17/2021
[9:41 AM] Dufresne, Eric
Strzalka, Joe I think we are happy in 8-ID-I. Fell free to start Jiang, Zhang and Strzalka, Joe.

To summarize, we are in a new mode of operation in Hybrid mode from 324 bunch-mode last week. Flux in 8-ID-I is back
to normal at 1.33x10^12 ph/s in a 250x250 um si1, and 7.93x10^11 ph/s in a 250 (H) x 150 (V) beam on pind1.

<https://teams.microsoft.com/l/message/19:[email protected]/1637163677964?tenantId=0cfca185-25f7-49e3-8ae7-704d5326e285&amp;groupId=4c5a5c95-cec4-4898-b2db-37615c5a8ceb&amp;parentMessageId=1637160445263&amp;teamName=DYS_General&amp;channelName=8-ID-I Ops&amp;createdTime=1637163677964>

[9:45 AM] Dufresne, Eric
Zhang, Qingteng The beam is also in good shape on pind2 with a flux of 3.28x10^10 ph/s in a 15 um H si1hgap.
This is only 10% lower that on 10/19/2021 where it was 3.6x10^10 ph/s. Recall last week it was only 1.44x10^10 ph/s.
I am going to let you take over. I have something at 10am for APS-U, and I don't know what you have in the sample stage.

(1 liked)<https://teams.microsoft.com/l/message/19:[email protected]/1637163932527?tenantId=0cfca185-25f7-49e3-8ae7-704d5326e285&amp;groupId=4c5a5c95-cec4-4898-b2db-37615c5a8ceb&amp;parentMessageId=1637160445263&amp;teamName=DYS_General&amp;channelName=8-ID-I Ops&amp;createdTime=1637163932527>

I did also perform a crlx scan with pind2 with si2 at 150 um (V) by 15 um (H).
This is shown here: https://8id.xray.aps.anl.gov/specplots/8idi/2021/11/tingxu20211117/s00002.svg
The transmission is quite flat, would expect the beam footprint of 0.25 mm so looks good
when sampled with 15 um beam on si2hgap.

12/07/2021
Preparing for 7.35 keV in 8ID-I.
Will focus on sample, equivalent to N=7, R=0.2 mm.
Labelled earlier a lens set with red dot.
I think I located it so that I would use it this time.
Also labelled a second set with a blue dot, set was labelled 4A as well.

12/08/21
Good alignment of 8-ID for 7.35 keV ops. Flux down 13% from Nov 2 alignment.
https://anl.app.box.com/file/893637342395