8-ID
  8-ID Beamline logbook mirror  Not logged in ELOG logo
Message ID: 846     Entry time: Fri Jun 10 16:43:43 2022
Author: Eric Dufresne 
Type: 8-ID General 
Category: User Manual 
Subject: Virtual Tour Eric and Qingteng recorded of 8-ID-A, D, E and I, plus a short tour of the chem lab 
This is how the beamline looked before we rebuild everything.

[4/29/2021 10:44 PM] Zhang, Qingteng
Dear All, here's the Box link to the Virtual Tour Eric gave to 8-ID-A, D, E and I, plus my
short tour of the chem lab featuring the use of QNW and the loading of the cell, totaling ~43 min.
https://anl.box.com/s/sp99nqvc72wyi6b7kan8h7rlvm444wcn

[4/29/2021 10:46 PM] Zhang, Qingteng
We had to shoot it twice because of my technical mistake the first time (Never rotate camera in the middle
of the recording if you want to view it on computers later). I am very grateful for Dufresne, Eric's
understanding and his knowledge and expertise throughout the entire process. It was a great learning experience for me

[4/29/2021 10:48 PM] Zhang, Qingteng
There's an extra ~ 13 min video Eric recorded in which he went through a bit more details on the alignment
at the A hutch. It was very informative for me and may be of help to Peco, Ash and Miaoqi as well. I highly
recommend this series.
ELOG V3.1.4-395e101