8-ID
|
8-ID Beamline logbook mirror |
Not logged in |
|
|
Message ID: 849
Entry time: Tue Jun 28 18:53:35 2022
|
Author: |
Eric Dufresne |
Type: |
8-ID-E |
Category: |
Controls |
Subject: |
Replaced BPM controller from Newport with 2 SMC100PP controller |
|
|
Controls work: https://logbook.xray.aps.anl.gov/8id/controls/135
Current screen are shown in att 1 and 2.
They need to be homed to work.
HomeR (Reverse home) will bring the stage closest to the side of the cable.
I changed the direction for ebpmz |
|
|
|
|