8-ID
8-ID Beamline logbook mirror, Page 3 of 44
Not logged in
List
|
Find
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
8-ID General
8-ID-A
8-ID-D
8-ID-E
8-ID-"G"
8-ID-I
Office and Labs
Other
8-ID-
8-ID-E&I
-- Category --
Safety
Problem
Controls
Detectors
Software
Computers and Network
Manuals
EPS
Setups
Presentations
Other
Beamline Hardware
Procedures
Shutdown Activities
Experiment
spec macros
Important Log Books
Temperature Controller Issues
Vendor contacts
Peltier Device
standard quotations for Beamline Components
SDLT Tape Drive
Gas bottle system
SPEC
Mechanical Stages - parameters
861 Entries
Goto page
Previous
1
,
2
, 3,
4
...
42
,
43
,
44
Next
ID
Date
Author
Type
Category
Subject
Text
42
Fri Mar 24 17:07:02 2006
Alec
8-ID-D
Problem
diamchi table record
displays yellow text "Comm. Failure" and,
perhaps related, Michael is seeing diamchi
bounce back to its original position after
43
Tue Mar 28 17:14:13 2006
Alec
8-ID-D
Problem
monochromator encoders-gonio2
[quote]Moncohromator encoder on gonio2 does
not update with moves[/quote]
44
Tue Mar 28 17:26:39 2006
Alec
8-ID-D
Controls
moving diamchi, gonio1, gonio2, 8idd:sm1, 8idd:Table1
User access security has been enabled for
these motors per http://8id.xor.aps.anl.gov/elog/8-ID/42.
To use these motors, you must start medm
45
Tue Apr 4 17:07:17 2006
Larry
8-ID-
Setups
Feedback from Pollanen Aerogel SAXS run - March 2006
1) sg3 slits: I think you are already
aware of the issue, but just in case I will
re-iterate what we notice. At some point
48
Tue Apr 25 22:16:48 2006
Alec
8-ID General
Shutdown Activities
2006-2 (May 2006) shutdown task list - ver 0.11
Revised shutdown task list from 8-Id Ops meeting
on 4/25/2006
49
Wed Apr 26 13:17:54 2006
Alec
8-ID General
Presentations
2006/04/26 TRR Group Meeting presentation
Update presented to TRR group meeting on 4/26/06.
Shutdown plans and I monochromator install
update.
50
Wed Apr 26 15:21:20 2006
Alec
8-ID General
Presentations
New ANL brand (2006) poster template
I have attached a poster template from Rich
Fenner reflecting the new ANL brand (as of
Feb. 2006 or so). I am guessing it will
51
Thu May 18 14:17:18 2006
Alec
8-ID General
Controls
PV archiver add list - 2006-05-18
52
Thu May 18 14:17:56 2006
Alec
8-ID General
Controls
8-ID PV Archiver Delete List - 2006/05/18
53
Fri May 19 10:44:36 2006
Alec
8-ID-I
Setups
I Mono mapped positions and table potentiometers after coarse reposition
Mapped I optical table after rough x-ray beam
alignment was completed at end of 2006-1.
Mapped positions shown in word doc. Then
54
Tue May 23 16:59:55 2006
Alec
8-ID General
EPS
EPS Programmer - John Servino - contact information
Code in the 8-ID EPS system is currently supported
by John Servino - a consultant - from Professional
Automation Services. Contact info for him
55
Wed May 24 17:35:24 2006
Alec
8-ID-
EPS
Temporary control of the 8-ID-G valve - Valve 11
The EPS HMI interface is not currently connected
to the Valve 11 (8-ID-G) vacuum valve open
and close signals. A temporary fix is to
56
Wed May 31 13:58:44 2006
Michael and Suresh
8-ID-I
Setups
Mono Beam Table Positions - May 2006
The pseudo channel cut mono was aligned to
mono beam. The table heights were set using
transit and the table-z positions are as
57
Thu Jun 1 19:13:30 2006
Michael Sprung
8-ID General
Setups
I Monochromator commissioning results - part 2
1) Encountered a problem with the nano motion
stage while trying do measure a table to
convert the translation [mm] to angle [deg.].
58
Fri Jun 2 13:11:48 2006
xuefa li
8-ID General
Setups
diam positions
Beam goes through the centers of both G- and
E-beamline. Here are the positions of the
D-Mono:
60
Fri Jun 2 18:52:18 2006
Suresh
8-ID General
Setups
I Monochromator Commissioning results part3
The foll. things were observed while measuring
images on the cool snap.
61
Sat Jun 3 15:21:09 2006
Michael Sprung
8-ID General
Setups
measured flux at 8-ID-I plus misc. mirror notes
1) there seems to be a problem going negative
on the mirror translation (needs further
investigation)
62
Tue Jun 6 13:39:23 2006
xuefa li
8-ID General
Setups
final diam postions
for (111):
diamth diamchi diamx diamz
17.03 -0.01 -14.35 14.24
63
Wed Jun 7 17:43:24 2006
Suresh
8-ID-I
Detectors
Shutter open and close times - rough numbers
Full Frame:
OPEN_DELAY = 0.08
CLOSE_DELAY=0.08
64
Thu Jun 8 11:34:56 2006
Alec
8-ID-I
Setups
I monochromator mono beam height change with angle/energy
As the monochromatic energy selected by the
new I mono is changed, the beam moves vertically
by a small but not insignificant amount.
Goto page
Previous
1
,
2
, 3,
4
...
42
,
43
,
44
Next
ELOG V3.1.4-395e101