8-ID
  8-ID Beamline logbook mirror, Page 3 of 44  Not logged in ELOG logo
ID Date Author Typeup Category Subject Text Attachments
  76   Wed Jul 19 09:52:57 2006 Alec8-ID GeneralControlsEPICS boot scriptsEPICS boot script location to see what serial
port is assigned to what, for example ...
  
  77   Thu Jul 20 11:46:42 2006 Alec8-ID GeneralSoftwareconvert.i script for uncompressing SMD dataFrom yorick, first read in convert_imm3.i
and then can use following file to uncompress
compressed SMD data:
  
  78   Mon Jul 24 14:48:49 2006 Xuesong8-ID GeneralControlscheck an autosave file against a running ioc: an useful program to prepare IOC rebooting.FYI, This is what Tim Mooney replied to Daniel
Legnini's question:
  
  87   Sun Aug 6 14:53:08 2006 Mark Sutton8-ID GeneralEPSD-I transport vacuum tripThe EPS tripped on a vacuum fault for the
D-I transport. Checked vacuum readings
and they were good. Reset alarm and it cleared.
  
  89   Tue Aug 8 01:34:57 2006 Mark Sutton8-ID GeneralSoftwareNotes on new version and setup for yorickI added the new Yorick (2.1) to the tree in
yoradmin.
  
  90   Tue Aug 8 01:37:29 2006 Mark Sutton8-ID GeneralControlsToo easy to close wrong shutterThe open/close shutter buttons on the epics
beamline windows are too small
and too close together. I would recommend
  
  92   Tue Aug 15 10:07:01 2006 Alec8-ID GeneralDetectorschip damage on the new dalsa/smd after surface xpcsOne week of surface xpcs produced the following
(but detector just puit back in beamlne so
temperature is still elevated):
 Screenshot-Yorick_0.pngScreenshot-Yorick_3.png 
  93   Tue Aug 22 10:09:37 2006 Mark Sutton8-ID GeneralControlsToo easy to close wrong shutter[quote]The open/close shutter buttons on the
epics beamline windows are too small
and too close together. I would recommend
  
  94   Tue Aug 22 15:45:50 2006 Alec8-ID GeneralPresentationsANL ppt template - August 2006   ANLTemplate_Aug2006.ppt 
  95   Tue Aug 22 16:35:18 2006 Alec8-ID GeneralShutdown ActivitiesSeptember 2006   Projects_v0-10.xls 
  96   Wed Aug 23 11:11:48 2006 Harold Gibson8-ID GeneralSafetyUpdated safety planHere are also some safety related links:

1. APS User Policies and Procedures:
 cat_safty_plan1rev4d_2006.doc 
  97   Fri Aug 25 13:21:42 2006 Alec8-ID GeneralManualsDigitel MPC Controller manualThe Gamma Vacuum web site has the annoying
feature of requiring a login before documentation
is made available.  So attached is the Digitel
 MPC_J.pdf 
  100   Fri Aug 25 16:42:32 2006 Suresh Narayanan8-ID GeneralManualsEnergy calibration chart from Brookhaven/1-BMAbsorption edge plots are attached in a pdf
file. It contains sevral edges from 6 kev
to 20 kev or so.
 Absorption_Energy_calibration_document.pdf 
  101   Tue Aug 29 18:16:29 2006 Suresh Narayanan8-ID GeneralVendor contactsKEPCO ContactKepco contact number is:
718-461-7000
  
  102   Thu Sep 7 10:28:12 2006 Alec8-ID GeneralSafetyY2-50 8-ID-A side-bounce mirror review material - Jan. 12, 2006Material presented to the Beamline Safety
Design Review Steering Committee (BSDRSC)
on Jan. 12, 2006.
 AMirrorUpgradeReview.ppt 
  103   Thu Sep 7 10:33:33 2006 Michael8-ID GeneralSafety8-ID-D pogo stick upgrade review material - Nov. 7, 2005Material presented to the Beamline Safety
Design Review Steering Committee (BSDRSC)
on Nov. 7, 2005.  Attachments include Soon
 D_station_monochromator_upgrade.pptDesign_Review_D_monochromator_Soon_Hong.pdf 
  104   Thu Sep 7 10:35:58 2006 Michael8-ID GeneralSafety8-ID-D pogo stick upgrade review material - Nov. 7, 2005Approval from the BSDRSC (attached)

[quote]Material presented to the Beamline
 TN05-033_Closeout.pdf 
  105   Thu Sep 7 10:36:32 2006 Alec8-ID GeneralSafetyY2-50 8-ID-A side-bounce mirror review material - Jan. 12, 2006Approval from the BSDRSC (attached)

[quote]Material presented to the Beamline
 TN05-031_Closeout.pdf 
  106   Fri Sep 8 11:48:25 2006 Suresh Narayanan8-ID GeneralPeltier DeviceHigh temperature Peltier's usedThe High temperature being used at 8-ID are:

1. HT8-7-30
  
  107   Fri Sep 8 11:49:24 2006 Suresh Narayanan8-ID Generalstandard quotations for Beamline ComponentsQuotes for to be filled in later.   
ELOG V3.1.4-395e101