8-ID
  8-ID Beamline logbook mirror  Not logged in ELOG logo
Message ID: 639     Entry time: Thu May 16 11:05:40 2019
Author: Joe Strzalka 
Type: 8-ID-"G" 
Category: Safety 
Subject: Linkam Cryogen SOP 
Attachment 1 is the Standard Operating Procedure for working with the Linkam thermal stage and the 2L LN2 Dewar, as updated 2019/03/11.
Attachment 1: LinkamSOP_updated20190311.pdf  86 kB
ELOG V3.1.4-395e101