8-ID
|
8-ID Beamline logbook mirror |
Not logged in |
|
|
Message ID: 639
Entry time: Thu May 16 11:05:40 2019
|
Author: |
Joe Strzalka |
Type: |
8-ID-"G" |
Category: |
Safety |
Subject: |
Linkam Cryogen SOP |
|
|
Attachment 1 is the Standard Operating Procedure for working with the Linkam thermal stage and the 2L LN2 Dewar, as updated 2019/03/11. |
|