8-ID
  8-ID Beamline logbook mirror  Not logged in ELOG logo
Entry  Mon Oct 21 23:03:57 2019, Eric Dufresne, 8-ID-I, Sample Environments, New double Peltier stage for fly scanning stage 8x
    Reply  Tue Sep 21 14:27:41 2021, Eric Dufresne, 8-ID-I, Sample Environments, New double Peltier stage for fly scanning stage--updates in sample mounts by QZ IMG_1262.jpegIMG_1256.jpeg
Message ID: 680     Entry time: Mon Oct 21 23:03:57 2019     Reply to this: 807
Author: Eric Dufresne 
Type: 8-ID-I 
Category: Sample Environments 
Subject: New double Peltier stage for fly scanning stage 
Dana, Qingteng and Don Jensen designed a new double-Peltier stage for
fly scanning with multiple samples to test. We tested one with 5 as shown in att. 7 and 8.

The attachment below are the last settings of the new cell.
Feedback on IN3 of Lakeshore 336, type K. Othe rtype K on IN4.
This uses the new fly scan capability coupled with a new heater block.
Some of the technical motor location are shown in att. 5 (mostly for my own good).

Also ion chamber can be plotted from /home/beams/8IDIUSER/User_XPCS_DATA_Logs/
Attachment 1: PID_controls.png  15 kB  Uploaded Tue Oct 22 00:07:06 2019  | Hide | Hide all
PID_controls.png
Attachment 2: Lakeshore336.png  27 kB  Uploaded Tue Oct 22 00:07:42 2019  | Hide | Hide all
Lakeshore336.png
Attachment 3: PID1params.png  11 kB  Uploaded Tue Oct 22 00:08:10 2019  | Hide | Hide all
PID1params.png
Attachment 4: ramp.png  12 kB  Uploaded Tue Oct 22 00:08:27 2019  | Hide | Hide all
ramp.png
Attachment 5: FlyScanMotorLocation.png  163 kB  Uploaded Tue Oct 22 00:10:40 2019  | Hide | Hide all
FlyScanMotorLocation.png
Attachment 6: Kepco.png  19 kB  Uploaded Tue Oct 22 00:13:58 2019  | Hide | Hide all
Kepco.png
Attachment 7: s00003.svg  43 kB  Uploaded Tue Oct 22 00:18:29 2019  | Hide | Hide all
s00003.svg
Attachment 8: s00009.svg  44 kB  Uploaded Tue Oct 22 00:18:43 2019  | Hide | Hide all
s00009.svg
ELOG V3.1.4-395e101