8-ID
  8-ID Beamline logbook mirror, Page 32 of 42  Not logged in ELOG logo
Entry  Thu Jul 23 15:35:15 2009, 8ID staff (posted by Joe), 8-ID-I, Experiment, COSAXS energy choice: 5 keV vs 7.76 keV TN-1.pdf
Entry  Thu Jul 16 13:28:57 2009, Joseph Strzalka, Office and Labs, Safety, ESAF for work in Polymer Lab 401/L2104 (spin coater) 
Entry  Tue Jul 14 16:03:38 2009, Suresh Narayanan, 8-ID General, GridFTP, Grid FTP commands 
Entry  Tue Jul 7 15:30:35 2009, Zhang Jiang, 8-ID-I, Liquid Surface XPCS, Liquid surface setup for Langmuir trough langmuir.doclangmuir.pdf
Entry  Wed Oct 22 17:14:50 2008, Alec, 8-ID-"G", Setups, Multilayer scan with 8-ID-G setup multilayer.pdf
    Reply  Sat Jun 13 16:27:53 2009, Alec, 8-ID-"G", Setups, Multilayer and PS film reflectivities by Pilatus in 8-ID-G ps.pdfmultilayer.pdf
Entry  Tue May 12 16:58:38 2009, Alec, 8-ID-A, Controls, Mitutoyo linear gage counter serial communication parameters Mitutoyo.pdf
Entry  Fri Apr 17 17:53:22 2009, Suresh Narayanan, 8-ID-I, Liquid Surface XPCS, Liquid Surface - Reflectivity 9x
Entry  Tue Feb 17 16:40:42 2009, Suresh Narayanan, 8-ID-I, Liquid Surface XPCS, Liquid Surface Scattering 7x
Entry  Tue Feb 17 14:36:35 2009, Suresh Narayanan, 8-ID General, Computers and Network, Mounting XOR disks and beamline user home directories on Linux, PC and Mac 
Entry  Fri Feb 13 16:50:10 2009, Zhang Jiang, 8-ID-D, Problem, replacement of gonio2 driver for diamchi  
Entry  Fri Feb 13 16:44:58 2009, Zhang Jiang, 8-ID-"G", Setups, Liquid surface scattering setup Liquid_8idg.doc
Entry  Mon Dec 1 18:18:55 2008, Suresh Narayanan, 8-ID General, Computers and Network, NX Client Documentation aps_1262111.pdf
Entry  Mon Nov 24 09:13:49 2008, Suresh Narayanan, 8-ID General, Controls, ACS Step Pak Manual ACS-_Step-Pak_System_User_Manual_Rev_2.2.pdf
Entry  Thu Nov 20 10:05:30 2008, Suresh Narayanan, 8-ID-"G", Experiment, GISAXS sample chamber - sample temperature calibration Temperature-Calibration-E-station.pdfTemperature-Calibration-E-station.doc
Entry  Wed Oct 4 10:20:54 2006, Michael Sprung, 8-ID-E, Beamline Hardware, Commissioning of new D monochromator 
    Reply  Wed Oct 18 09:15:09 2006, Michael Sprung, 8-ID-E, Beamline Hardware, Commissioning of new D monochromator 
       Reply  Mon Nov 17 17:31:00 2008, Alec, 8-ID-E, Beamline Hardware, Commissioning of new D monochromator 
       Reply  Tue Nov 18 08:21:01 2008, Alec, 8-ID-E, Beamline Hardware, Commissioning of new D monochromator Si220_E7p35.pngSi220se2.pngSi220table.png
Entry  Mon Nov 3 17:36:14 2008, Suresh Narayanan, 8-ID General, Computers and Network, XOR FTP site for outgoing and incoming access 
Entry  Thu Oct 16 14:44:04 2008, Suresh Narayanan, 8-ID-A, Procedures, Rhodium stripe on the Mirror in 8-ID-A 8IDA_Si_Rh_Stripes_Oct2008.pdfsi1verticalslitsizeE1andE3.png
Entry  Thu Oct 2 15:28:47 2008, Alec, 8-ID-"G", Setups, 8-ID-G distances 
Entry  Wed Oct 1 15:00:07 2008, xuesong, 8-ID General, spec macros, spec macros subversion control 
Entry  Tue Sep 30 17:38:40 2008, Suresh Narayanan, 8-ID General, SPEC, Spec CCD macros made by Xuesong, BCDA group 
ELOG V3.1.4-395e101