8-ID
  8-ID Beamline logbook mirror, Page 10 of 42  Not logged in ELOG logo
Entry  Tue Mar 14 11:15:53 2017, Eric Dufresne, 8-ID-E, Controls, Eurotherm support for 8-ID-E and serial port tester asyn17-24.pngEurotherm2408.pngimage2.JPG20170314_145802.jpgMiniTester_DB9.pdf
    Reply  Tue Nov 26 15:50:28 2019, Eric Dufresne, 8-ID-E, Controls, Eurotherm support for 8-ID-E, TDK Lambda power supply, and serial port tester EurothermPID.png
Entry  Mon Nov 18 23:39:39 2019, Eric Dufresne, 8-ID-I, Controls, Restored DG1, SR535 delay generator from SRS devDG535.png
Entry  Tue Nov 12 14:05:57 2019, Joe Strzalka, 8-ID-"G", Software, Writing macros in Spec at 8-ID-E WrtingMacrosInSpecAt8IDE.pdfWrtingMacrosInSpecAt8IDE.docx
Entry  Tue Nov 12 13:51:39 2019, Eric Dufresne, 8-ID-I, Controls, Lesson from alignment of USAXS unfocused 11/12/19 8idi-scan1.png8idi-scan1-saveData.pngweichen20191112_0006.pngweichen20191112_0009.png
Entry  Fri Nov 8 14:21:43 2019, Eric Dufresne, 8-ID-E, Beamline Hardware, Status of DAC and ADC in 8-ID-E-- tested the 8-ID-G IP330 ADC in the back of the rack. 7x
Entry  Mon Nov 4 17:13:26 2019, Eric Dufresne, 8-ID General, Optics, 8-ID beamline drawing and ray tracings 
Entry  Wed Oct 23 11:30:22 2019, Eric Dufresne, 8-ID-E, Setups, Tuning of 8-ID-E ADC oven 
Entry  Mon Oct 21 17:11:58 2019, Eric Dufresne, 8-ID-I, Optics, New test in 8-ID-I with 3 R=0.1 mm and one R=0.5 mm 2D lenses for Conrad's group at 7.35 keV lensChange-102119.png2155_001.pdf
Entry  Wed Oct 16 13:10:40 2019, Eric Dufresne, 8-ID-A, EPS, Bleps tripped due to a mirror fault Image-1.jpegImage-2.jpeg
Entry  Thu Oct 10 18:02:57 2019, Joe Strzalka, 8-ID-"G", User Manual, caQtDM display: 8IDGslits_widget.ui slits8IDG_widget.png
Entry  Sat Oct 5 14:56:37 2019, Eric Dufresne, 8-ID General, Computers and Network, snow, talc, amethyst, glass and 8idpixirad now have 10G cards 
Entry  Fri Oct 4 10:15:07 2019, Eric Dufresne, 8-ID-E, Experiment, Commissioning experiment summary in 8-ID-E WA-XPCS Google-8-ID-E_Logbook_for_2019-3.pdf
Entry  Mon Sep 30 22:03:05 2019, Eric Dufresne, 8-ID-I, Optics, Location of crl for 7.35 and 10.9 keV operation  dufresne112319-scan2-crlx.pngdufresne112319-scan4-crlz.png
Entry  Sun Sep 29 18:38:27 2019, Joe Strzalka, 8-ID-"G", Sample Environments, Thermal Annealing: Thermal Grease ApiezonGreaseSpecs.pdf
Entry  Fri Sep 27 15:29:58 2019, Joe Strzalka/Ray Ziegler, Office and Labs, Chem Waste, Chemical Waste forms and info, 2019.09.27 Simple_Waste_Instructions.pdf000_Chem_Waste_Log_-_APS_v9.pdf000_Chem_Waste_Log_-_APS_v9_example.pdf
Entry  Fri Sep 27 15:05:38 2019, Joe Strzalka, 8-ID-"G", Sample Environments, Solvent Vapor Annealing Manifold and Check Valves SVA_Manifold_CheckValves.jpg
Entry  Fri Sep 27 15:02:26 2019, Joe Strzalka, 8-ID-"G", Sample Environments, Solvent Vapor Annealing Chamber SVA_Chamber.jpg
Entry  Fri Sep 27 14:43:51 2019, Joe Strzalka, 8-ID-"G", Sample Environments, Solvent Vapor Annealing 8IDE_GIXS4SEISIG_20200123_SVA_RH.pdf
Entry  Thu Sep 19 15:00:39 2019, Eric Dufresne, 8-ID-I, Timing, New Heliax cable for 8-ID-I to bring timing signals inside 8-ID-I 2017_001.pdf
Entry  Thu Sep 19 11:41:33 2019, Eric Dufresne, 8-ID General, Administrative, TWG talk September 19, 2019 VerifyTheContribution.pdf
ELOG V3.1.4-395e101