8-ID
  8-ID Beamline logbook mirror, Page 26 of 42  Not logged in ELOG logo
Entry  Fri Oct 18 14:14:30 2013, Joe Strzalka, 8-ID-"G", Sample Environments, High temperature oven HighTempOvenRecommissioning.pdfHighTemperatureOven.pdfGISAXS_heating_chamber_design2011.pptxOmegaThermalcoupleGaugeInstructions.pdf
Entry  Thu Oct 3 12:06:22 2013, Joe Strzalka, 8-ID-"G", LTO Tape Drive, Backup: SDLT Tape Archive for 8IDGUSER 2012-1 thru 2013-2 inclusive 
Entry  Wed Aug 28 16:49:34 2013, Suresh Narayanan, 8-ID General, IT/BCDA/SSG Meeting Updates, IT/BCDA/SSG Monthly Meeting Updates 
Entry  Wed Jul 31 12:04:44 2013, Joe Strzalka, 8-ID-"G", Procedures, tipsheets for GISAXS, GIWAXS GISAXStipsheet_vPilatus4.docxGIWAXStipsheet_vPilatus1MF.docxGISAXStipsheet_vPilatus4.pdfGIWAXStipsheet_vPilatus1MF.pdf
Entry  Mon Jul 8 17:58:24 2013, Ray Ziegler, 8-ID General, Chem Waste, Chemical Waste Log Sheet - updated July 2013 000_Chem_Waste_Log_-_blank2.pdf
Entry  Tue Jun 11 14:20:52 2013, Joe Strzalka, 8-ID-"G", spec macros, smartnames macro for meaningful GIXS filenames 
Entry  Fri Jun 7 12:20:09 2013, Suresh Narayanan, 8-ID-I, LTO Tape Drive, Tape Archive: 2013-1 
Entry  Tue May 28 09:39:52 2013, Alec, 8-ID General, EPS, Login and flow setpoints 
Entry  Thu May 23 11:52:10 2013, Joe Strzalka/Zhang Jiang, 8-ID General, Documentation, beamtime schedule spreadsheet 8-ID_2013_02_Schd_v1.xls8-ID_20XX_YY_Schd_blank.xls
Entry  Thu Apr 25 13:19:59 2013, Suresh Narayanan, 8-ID General, Beamline Hardware, T-46 and T-47 Sample table drawings for GISAXS and XPCS T6-46_and_47_construction_copy.pdf
Entry  Tue Apr 2 16:09:59 2013, Suresh Narayanan, 8-ID-I, Beamline Hardware, tuning fork shutter enclosure drawings tuning_fork_shutter_-_Request_for_a_estimate_for_fabrication.zipTuningFork_shutter_assembly_09282011.pdf
Entry  Sun Jul 31 16:04:30 2011, Zhang Jiang, 8-ID-"G", Setups, Liquid surface setup using mirror Liquid_8idg_20110727.doc
    Reply  Mon Mar 25 11:58:20 2013, Zhang Jiang, 8-ID-"G", Setups, Liquid surface setup using mirror Mirror8IDE_FinalState20130325.pdf
Entry  Thu Aug 11 09:34:14 2011, Alec, 8-ID-E, Setups, Switching over from E to G Hexapod_position_20110814.pdf
    Reply  Fri Feb 1 14:01:56 2013, Joe, 8-ID-E, Setups, Switching over from E to G 
Entry  Mon Feb 6 16:16:26 2006, Alec, 8-ID General, Detectors, MCA Setup 8id_mca_setup.pdf8id_mca_setup.ppt
    Reply  Mon Feb 6 16:37:25 2006, Alec, 8-ID General, Detectors, MCA Setup 
    Reply  Thu Jan 31 16:09:21 2013, Joe, 8-ID General, Detectors, MCA Setup 
Entry  Thu Dec 13 17:46:29 2012, Suresh Narayanan, 8-ID General, LTO Tape Drive, LTO-5 LTFS file system details 
Entry  Thu Dec 6 16:49:17 2012, Joseph Strzalka, 8-ID-"G", Beamline Hardware, GIXS diffractometer: Huber two-tilt stage/ height considerations / hole patterns GIXSdiffractometer_component_heights.pdfCuBlockM6Pattern.pdfCuBlockApproxDimensions.pdfCuBlockM6M10Pattern_adapter.pdf
Entry  Tue Nov 13 18:36:46 2012, Joe Strzalka, 8-ID-"G", Controls, Fast Shutter Control and Dual Triggering 2 Pilatus Detectors (softGlue) DualTriggerPilatus.pdf
Entry  Wed Aug 29 12:56:02 2012, Alec, 8-ID General, Manuals, Phytron SINCOS manual sincos-gb.pdf
Entry  Thu Aug 16 16:10:33 2012, Alec Sandy, 8-ID-I, Setups, Beryllium CRL assembly from Sector 7 - documentation 9x
Entry  Tue Jul 10 17:09:11 2012, Suresh Narayanan, 8-ID-I, Setups, XPCS under Helium environment 
ELOG V3.1.4-395e101