8-ID
8-ID Beamline logbook mirror, Page 23 of 42
Not logged in
List
|
Find
|
Help
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
8-ID General
8-ID-A
8-ID-D
8-ID-E
8-ID-"G"
8-ID-I
Office and Labs
Other
8-ID-
8-ID-E&I
-- Category --
Safety
Problem
Controls
Detectors
Software
Computers and Network
Manuals
EPS
Setups
Presentations
Other
Beamline Hardware
Procedures
Shutdown Activities
Experiment
spec macros
Important Log Books
Temperature Controller Issues
Vendor contacts
Peltier Device
standard quotations for Beamline Components
SDLT Tape Drive
Gas bottle system
SPEC
Mechanical Stages - parameters
821 Entries
Goto page
Previous
1
,
2
,
3
...
22
, 23,
24
...
40
,
41
,
42
Next
Thu Mar 12 14:56:53 2015, Eric Dufresne, 8-ID General, Optics, Peak of the undulator spectrum at ~11 keV per Dejus and phasing at arbitrary energy
Tue Mar 10 11:00:14 2015, Eric Dufresne, 8-ID General, EPS, Possible EPS trip on 3/10
Wed Mar 4 08:46:30 2015, Eric Dufresne, 8-ID-I, Procedures, New beam stop choice
Tue Mar 3 14:35:00 2015, Zhang Jiang, 8-ID-E, Sample Environments, Humidity control setup using FSV10
7x
Wed Feb 11 12:56:51 2015, Ray Ziegler, 8-ID General, Wiring diagrams, RJ11 cables for Lakeshore and Syringe Pumps
Wed Feb 4 22:05:13 2015, Eric Dufresne, 8-ID-I, Experiment, Some interesting plots with 2-D Be lens and problems identified on 2/4/2015
11x
Wed Feb 4 09:01:47 2015, Eric Dufresne, 8-ID-A, Controls, Alec reports problem with white beam slits
Tue Feb 3 09:34:03 2015, Ray Ziegler, 8-ID General, Vendor contacts, Liquid Helium
Tue Feb 3 00:42:32 2015, Eric Dufresne, 8-ID-I, Optics, New Be lens mount for 8-ID-I
Fri Jan 30 00:53:41 2015, Eric Dufresne, 8-ID General, Safety, 8-ID Annual Routine Radiation Survey
Tue Jan 27 10:32:38 2015, Eric Dufresne, 8-ID General, EPS, strange ethernet failure of EPS switches
Fri Jan 23 16:07:32 2015, Eric Dufresne, 8-ID General, Computers and Network, iolite and peridot
Wed Jan 21 14:37:52 2015, Joe Strzalka, 8-ID-"G", Beamline Hardware, APD power supply: BK Precision 93130 Triple Output Programmable DC PS
Thu Jan 15 11:21:51 2015, Eric Dufresne, 8-ID-I, Sample Environments, Suresh's email on new capillary order, Torr seal properties
Tue Jan 13 09:57:25 2015, Eric Dufresne, 8-ID General, Computers and Network, hard drive on talc? failed, now repaired January 19.
Tue Jan 6 12:33:41 2015, Joe Strzalka, 8-ID-"G", LTO Tape Drive, Backup: LTO-5 Tape Archive for 8IDGUSER 2014-1 thru 2014-3 inclusive
Wed Sep 10 10:50:25 2014, Suresh Narayanan, 8-ID-I, SPEC, SPEC 6.02 installation
Fri Dec 19 09:18:51 2014, Jeff Kirchman, 8-ID-I, SPEC, SPEC 6.02 installation
Tue Dec 16 16:34:11 2014, Joe Strzalka, 8-ID-"G", Beamline Hardware, GIXS DIffractometer: Encoder calibration
Mon Dec 15 15:02:31 2014, Eric Dufresne, 8-ID General, Safety, [Aps_resident_users] Hutch Pneumatic Door Controls and PSS
Wed Dec 10 00:19:45 2014, Eric Dufresne, 8-ID-E&I, Computers and Network, Issues with automount are not fixed
Goto page
Previous
1
,
2
,
3
...
22
, 23,
24
...
40
,
41
,
42
Next
ELOG V3.1.4-395e101