8-ID
  8-ID Beamline logbook mirror, Page 43 of 44  Not logged in ELOG logo
ID Date Author Type Category Subject Text Attachments
  22   Wed Feb 15 15:39:16 2006 AlecOtherSetupsLegacy TRXS lineup documentBeginnings of a startup procedures for peridot
and mica.
 trxs-table.ps 
  21   Wed Feb 15 15:37:54 2006 Alec8-ID-ESetupsLegacy TRXS description documentTRXS setup:

The vertical spectrometer consists on a 2
  
  20   Wed Feb 15 15:25:37 2006 AlecOtherControlsLegacy table potentiometer informationLegacy table potentiometer information from
the 8-ID web site:
  
  19   Wed Feb 15 13:32:36 2006 Alec8-ID GeneralEPSEPS Trip[B]What to do on an EPS trip[/B]

The main (manual) EPS control and display
  
  18   Wed Feb 15 13:17:54 2006 Alec8-ID-EProceduresLegacy Zone plate set-up information from old web siteLegacy Zone plate set-up information from
old web site:
  
  17   Wed Feb 15 13:15:04 2006 Alec8-ID GeneralControlsX-Ray info (from old web site)X-Ray eye info from old web site - not sure
of validity:
  
  16   Wed Feb 15 12:09:28 2006 Alec8-ID GeneralSetups8-ID Energy and Undulator Gap8-ID's nominal operating energy, except via
prior consultation with the 8-ID beamline
staff, is 7.45 keV (Undulator Gap=17.60 mm)---our
  
  15   Wed Feb 15 12:02:39 2006 Alec8-ID GeneralProceduresAligning mirror after a fillThe procedure to align E and I stations after
a beam fill is:
  
  14   Wed Feb 15 11:56:17 2006 Alec8-ID GeneralControlsHow to start EPICS (medm really)How to start EPICS or more properly start
display the medm display manager:
  
  13   Tue Feb 14 10:58:59 2006 Alec8-ID-DSetups8-ID-D monochromator positionsUndulator Gap = 17.7 mm
Energy (1st Harmonic) = 7.5 keV
  
  12   Tue Feb 14 10:05:02 2006 Larry8-ID GeneralOtherDiscussion of choosing best photon energy for COSAXS   ChoosingEnergy.pdf 
  11   Tue Feb 14 09:42:32 2006 Alec8-ID-DBeamline Hardware8-ID-D Monochromator Venting and Pumpdown Procedure[B]Diamond Monochromator
pump down & venting procedure[/B]
 Mono_valve2.jpg 
  10   Tue Feb 14 09:18:03 2006 Alec8-ID GeneralComputers and NetworkList of devices on the 8-ID networkA list of devices on the 8-ID network (or
assigned to the network), can be obtained
by entering
  
  9   Tue Feb 14 09:15:23 2006 Alec8-ID GeneralComputers and Network8-ID Experiment Floor Computer Jack Layout8-ID Experiment Floor Computer Jack Layout.
 There should be a one-to-one correspondance
to the ports on the experiment floor switch.
 JackLayout_20040920.pptJackLayout_20040920.png 
  8   Wed Feb 8 11:05:09 2006 Alec8-ID GeneralDetectorsMCA and Multi-element detector set-up info from the X26 at the NSLSMCA and Multi-element detector set-up info
from the X26 at the NSLS:
http://www.bnl.gov/x26a/comp_med.shtml
  
  7   Tue Feb 7 13:37:46 2006 Alec8-ID-DHardwareMonochromator ion pump operation[I][B]Diamond Monochormator ion pump operation
instructions[/B][/I]
 Mono_ionp_ctr.jpg 
  6   Mon Feb 6 17:24:05 2006 Xuefa8-ID-ESetupsSi(220) beam position on the Entrance Be windowI estimated the minimum distance from the
diamond crystal to the top side of the exit
flansch to 675 mm, assuming the following
  
  5   Mon Feb 6 16:37:25 2006 Alec8-ID GeneralDetectorsMCA SetupOne should remember to this ...

[quote]The attached documents describe how
  
  3   Mon Feb 6 16:26:02 2006 Alec8-ID GeneralEPSLegacy EPS wiringLegacy (pre switchover to ASD-SI in 2004)
wiring diagram for the EPS.  Also, does not
include the slave IOC's added to 8-ID-E and
 plc_wiring.asc 
  2   Mon Feb 6 16:23:28 2006 Alec8-ID GeneralEPSValve and flowmeter and misc. EPS wiring gifsFlowmeter and valve and misc. EPS wiring gifs.  6x 
ELOG V3.1.4-395e101